Buenaventura Resilient City Goes Online

by hbmadero | Nov 18, 2026 | Projects | 0 comments

The Ciudad Resiliente Buenaventura (Resilient City of Buenaventura) now has its own website, bv.emandatum.com. It presents the Ordo Supremus Pro Causis Humanitariis preliminary project for a proposed new city of 10,000 homes on Colombia's Pacific coast, with a hospital, schools, a Humanitarian Hub and a productive hub by the port. This is a tour of what it shows.

10,000
Homes
150
Hospital beds
US$3,794.3M
Total cost
106 months
Full city
01

The need

A quake, and thousands of families without housing

The site starts from an event: a magnitude 7.4 earthquake that struck Buenaventura on August 10, 2026. Damage to housing is large but not yet precisely measured, and official and press counts differ. The public calamity was declared under Decree 1.03.01-1070 of 2026, and the final number of families will be set by the RUFE registry.

Note
The need is not Mandatum's own assessment: it is declared by the State.

The proposal is a complete new city, with no debt, no guarantee and no fiscal cost to Colombia. It sets five goals: 10,000 homes in two phases of 5,000; health, education and disaster-response services open to the wider population; jobs through a port-linked productive hub; operations that fund themselves; and payments tied to certified works.

bv.emandatum.com
The need section of bv.emandatum.com, titled A quake and thousands of families without housing
The first section: the earthquake and the declared need.
02

The land

The most important port, with little land available

Buenaventura is Colombia's main port, yet most of its land is legally protected, the city depends on a single road to the interior, and it faces earthquake, tsunami and flood threats. That is why the project looks for new land outside the coastal strip, in Valle del Cauca.

How land is obtained
Bought from private owners or through agreements with community councils, with consent and prior consultation where required.
Price
Never above the commercial appraisal. The budget assumes 100 million pesos per hectare, to be checked against official appraisals.
Decision point
The final site is chosen at Gate B and registered to Mandatum's local entity.
bv.emandatum.com
The territory section of bv.emandatum.com, titled The most important port, with little land available
The territory: the country's main port, with little usable land.
03

The concept

A new city, not a housing estate

The city is designed, contracted and run as one: a single master plan, a single General Contractor and a single administration. It is built in four neighborhoods of 2,500 homes each, with phase 1 covering neighborhoods 1 and 2 and phase 2 covering 3 and 4.

“A city with its own hospital, schools, water, energy and jobs can stand on its own.”
1,500 ha
Land
678 ha
Urban area
822 ha
Reserve
35,000
People (est.)
Six design principles
Premium quality, lower long-term operating costs, resilience to disasters, self-sustainability, permanent ownership and management, and respect for communities.
Each neighborhood
750 two-bedroom apartments (90 m²), 1,250 three-bedroom houses (110 m²) and 500 four-bedroom houses (130 m²). The mix is an assumption, to be adjusted with RUFE data.
bv.emandatum.com
The concept section of bv.emandatum.com, titled A new city, not a housing estate
The concept: one city, one master plan, one administration.
04

The components

Each component, with its function and its cost

The site walks through the pieces one by one, with amounts in US$ millions. Housing is the largest: US$1,663.2 million for 10,000 homes at US$1,540 per square meter, built to the NSR-10 seismic code. The homes are not sold, and rent is capped at 33% of household income.

Health and education
150 hospital beds and four neighborhood clinics; 4,000 school places plus 1,500 technical and university places.
Humanitarian Hub
A multipurpose hall and logistics yard, designed to keep working after an earthquake.
A productive hub
About 200,000 m² of logistics warehouses (US$120.0M), 20,000 m² of cold storage (US$30.0M), 300,000 m² of container yards, a 30,000 m² services campus and a 9,000 m² hotel zone. Demand is still to be confirmed by a market study.
Its own services
A solar plant of about 70 MW with storage (US$84M) and a water and wastewater plant (US$40M).
Security
A mainly electronic system with a 24-hour control center, coordinated with the National Police and paid from company rents, not from family rent.
bv.emandatum.com
The components section of bv.emandatum.com, titled Each component, with its function and its cost
Each component of the city, with its cost.
05

The families

Who receives each home, and how it is decided

Homes go to families who lost theirs or were left with an uninhabitable one, and to essential workers of the District. Allocation follows a regulated, public process run by an Adjudication Commission, whose composition and criteria are fixed in regulations approved before the first handovers.

The housing contract
Rent capped at 33% of income, with a floor of about 578,000 pesos a month; one income check per year; no sale, subletting or subdivision.
Communities
No displacement of ethnic communities, with prior consultation and agreements signed before any land is bought.
Local work
Hiring preference for local people, with on-site training.
Open point
The Governorate has suggested dispersed housing, which differs from this concentrated-city proposal. The two approaches must be reconciled with the Governorate and the District.
bv.emandatum.com
The social model section of bv.emandatum.com, titled Who receives each home, and how it is decided
The social model: who receives each home.
06

Operation and environment

A city that pays for itself

After construction, at Gate D, Mandatum's local entity owns and runs the city permanently. Revenue comes from rents, company rents, water and energy sales and services, and any surplus is reinvested in the city.

US$110.0M
Sustainment fund
US$55.0M
For phase 1
170 ha
Green areas
~70 MW
Own solar

The fund covers early deficits. It is released quarterly against certified reports and paid directly to providers until the city breaks even. Environmentally, the city treats its own water and processes its own waste in a recycling and biogas plant.

bv.emandatum.com
The environment section of bv.emandatum.com, titled A city that produces its own services
The environment: solar energy and water of its own, set within the forest.
07

Financial integrity

The money never passes through the hands of those who manage it

Funds stay in custody accounts, split by Gate, and are paid directly to registered, verified suppliers. Neither the Order, its local entity nor the General Contractor receives funds to administer. Each payment follows seven steps, and no Gate is paid before the previous one closes.

The site names the independent actors: the technical certifier, the contractor, the custodian bank, the external auditor and the public counterparts. It acknowledges that the certifier is institutionally linked to Mandatum and lists five safeguards to offset that.

08

The budget

Total project cost: US$3,794.3 million

Of the total, US$3,684.3 million is capital cost and US$110.0 million is the sustainment fund, which is not capital cost. The contingency reserve is US$394.7 million, 12% of the base cost.

Largest capital-cost lines listed on the site
Housing (10,000 homes)US$1,663.2M · 45.1%
Infrastructure and plantsUS$589.0M · 16.0%
Management, governance and controlUS$249.4M · 6.8%
Land, studies, master plan and engineeringUS$202.4M · 5.5%
Institutional, community and security facilitiesUS$74.7M · 2.0%
Site preparationUS$70.0M · 1.9%
Share of capital cost (CAPEX, US$3,684.3M). Other lines are not shown here.
Phase 1
5,000 homes: US$2,112.3 million, 55.7% of the total.

The site is candid that the figure could change before Gate C, for example if the General Contractor's costs turn out not to include overhead, contingencies and profit.

bv.emandatum.com
The budget section of bv.emandatum.com, titled Total project cost: 3,794.3 million
The budget: total cost and its breakdown by category.
09

The schedule

106 months for the full city, 78 for phase 1

Durations are estimates counted from the allocation of funds. Gate B is the most uncertain, since it depends on forest-reserve removal and prior consultation.

Four Gates, 106 months
A
B · 24
C · works, 70 months
D
A · 6 months activationB · 24 months design and landC · 70 months works (42 for phase 1)D · 6 months audit and handover

The page also lists ten main risks, each with probability, impact and response.

bv.emandatum.com
The schedule section of bv.emandatum.com, titled 106 months for the full city, 78 for phase 1
The four Gates on one timeline, for the full city.
10

The impact

Housing, health, education and work

The site ties the project to four of the Sustainable Development Goals, each with a target, a mechanism and an indicator.

SDG 11
Cities
SDG 3
Health
SDG 4
Education
SDG 8
Work

It cites an estimated 35,000 residents, still to be confirmed, 4,000 people trained and about 1,000 entrepreneur loans. Direct jobs are not yet quantified in this version.

bv.emandatum.com
The impact section of bv.emandatum.com, showing the four Sustainable Development Goals
The impact: four goals, each with a target, a mechanism and an indicator.
Assumed
The page closes with thirteen assumptions and government decisions, all to be confirmed: the final family count, concentrated city versus dispersed solutions, the land, forest-reserve removal, unit costs, hub demand and timelines. It is a preliminary project, and it says so.
Visit the site
The full summary of the preliminary project, with the budget, the schedule and the risk table, is at bv.emandatum.com.

A note on the images. The photographs on the site are concept illustrations, not final designs or real works, and the summary is informational: the technical documents govern.

This project also has a detailed technical document (investment costs, break-even point, maintenance, financing and ownership) available to members of the Order, who may request it from the Chancellery of the Order in their country.