The four Gates

STEP 5 OF THE MANDATUM METHOD

How does a project advance? One Gate at a time

Each project advances through four Gates, from A to D (in Spanish, Puertas). Each one is designed to sustain itself: if the following ones were never carried out, what has been built up to that point would keep working on its own.

Management is run by a project management office, with a base in Miami and another in the country.

Key ideaNo Gate opens until the previous one has closed.
A project management team gathered in front of a board with four columns of colored cards
GATE A

What is done first? Create operational centers

Mandatum is established in the country and the operational centers are created: local governance, banking and control mechanisms, general permits and the first physical presence. There is no construction yet.

A team sets up a new operations office: desks, computers and a plan on the wall
A surveyor with measuring equipment and a lawyer with documents walk over a green plot with mountains in the background
GATE B

What comes next? Buy the land

Master plan, technical studies (such as topography and geotechnics), legal due diligence on the title to the land, acquisition of the sites and registration of contractors.

GATE C

How is it built?

It is the largest part of the project: construction.

Workers in helmets raise the wooden structure of a house, with a crane in the background
Two auditors with a tablet and a folder walk through a finished wooden community building with a garden at the entrance
GATE D

How does it end? With a final audit

Reconciliation and final audit, and handover to Mandatum's management, which retains the administration to ensure the project's continuity.