Preliminary project
STEP 2 OF THE MANDATUM METHOD
What is a preliminary project?
The preliminary project is the complete study that responds to the need identified in Step 1: it explains what is proposed to be done, how it would be organized and managed, in what steps and how much it would cost.
It is the document with which Mandatum presents itself to communities and governments and, later, to those who can assign the project's funds. Mandatum prepares it with its own means.

1. What does it contain? The main documents
The preliminary project brings together seven main documents that are read together and share the same figures: from the summary that presents the need and the proposal, to the budget and the maps of the area.
Executive summary and transformative vision
It is the document read first: it presents the whole project in a few pages, for whoever must decide whether to support it.
Includes: the project summary; the context and diagnosis of the need; the proposed solution; alignment with the Sustainable Development Goals; the institutional architecture and governance; financial integrity and the self-sustainability of the operation; environmental sustainability and resilience; the summary budget and the schedule by Gates; the expected impact; the stated assumptions; and the conclusions and the request.
Descriptive report
It describes the project in detail: what the work is, how it is composed, how it works and how it is carried out. It complements the other documents and relies on them. What can only be confirmed with the Gate B studies is presented as an assumption, and what depends on an authority, as the Order's proposal.
Includes: the purpose and the need, with the situation of origin, the declared need, Mandatum's response and the objectives; the components of the project; how it works; and how it is carried out, with its annexes and cited sources.
Modus operandi
It explains how the project is managed: who decides and how execution is organized.
Includes: the governance and the project management office, with a base in Miami and another in the country; and certification and execution.
Steps to follow
It turns the budget into milestones: each step of the project, with its cost, its deadline and the evidence that proves it was met.
Includes: a summary table by milestone (code, name, amount, beneficiary, predecessors and duration); a sheet for each sub-milestone, with the action, the beneficiary and the evidence with its acceptance criterion; the catalog of evidence by type of work; and the risk matrix.
Budget
It is the calculation workbook with the total cost of the project, broken down item by item, so that any figure in the other documents can be traced back to its origin.
Includes: the capital cost and the operating sustainment fund, which together form the total cost of the project; the contingency reserve; the split by Gate; and automatic controls that verify that the figures add up.
CAPEX
It summarizes the project's capital cost by component and by phase: all the items needed to take the work from the assignment of funds to its handover to operation, including the contingency reserve. It does not include the operation of the finished work, which is sustained with its own income, nor the sustainment fund, which is presented separately.
Includes: the cost by component and by phase; the cost by Gate and over time, with the disbursement schedule; the unit indicators; and the cost range, between a minimum scenario and a pessimistic one.
Maps of the area and of the project
It gathers the maps that show where the project is and what constrains it. Since the specific site is identified at Gate B, the maps of constraints and candidate zones are estimates that are then redone with official georeferenced layers.
Includes: the regional location; the known restrictions on the land; and the candidate zones for the project.
2. How is it prepared? Researching and verifying
It starts from the initial record from Step 1, is researched with official and verifiable sources, each piece of data is confirmed against its source and the project is sized according to the verified need.

Initial information
What is known and what is missing is gathered.

Research
With official and verifiable sources.

Verification
Each piece of data is confirmed against its source.

Sizing
The size of the project is defined.
Preparing a preliminary project takes, for a medium-scale project, between 14 and 26 weeks. It is written in the official language of the counterpart and also in English and Spanish.
3. What rules does it follow? Three that do not change
Every preliminary project is built on the same rules, regardless of the country or the size of the project.

Each phase sustains itself
If the following ones were never carried out, what has been built would keep working on its own.

No cost or debt for the State
No debt, no guarantee and no fiscal cost at any stage.

Direction belongs to Mandatum
Direction and management belong to it, and it selects its suppliers on technical criteria of quality, experience, cost and compliance.
4. Are there more documents? Many more
Besides the main documents, the preliminary project brings together many more: in general, about 25 documents in total. Among them are documents that serve to check that the project is economically sustainable, such as the CAPEX.